Engineering Standards

2019 Engineering Standards

Private Project Closeout Requirements

In order for projects with public utilities (streets, water, sewer, etc.) to receive Final Plat or Certificate of Occupancy, final acceptance of the public utilities must occur.   To consider acceptance of any public utilities, a Private Project Acceptance Checklist  must be completed and submitted to the Public Works Office Manager as a single complete package.  Individually submitted items will not be accepted.

Section 2.3 on page 28 of the Engineering Standards provides details on the content and format of as-built drawings. A project that includes standard water and sewer services, without a hydrant, main extension, or stormwater plan, would not require engineering plans or as-built drawings. Please note that some projects may require approval from additional regulatorily authorities such as DEQ, MDT, FWP, FCD, or others.